Experience with CIRCULAR CAST-IN-PLACE PRESTRESSED CONCRETE TANKS designed in accordance with the AWWA D115-06 Standard or its Predecessors

 

Designed by: Steven R. Close, PE, now with Close Associates, LLC
Owner,
Location,
Client(If Not Owner)
Date Bid(B) Completed(C) or Negotiated(N) Size in MG Remarks Cost in Dollars Cost in cents/Gallon
City of Layton, UT

Oakridge Tank

VSL Corporation

2012 (B) 2.0 Horizontal and vertical post-tensioned; buried, 1-ft cover on roof; post-tensioned floor and roof slabs. Price includes excavation and backfill. Seismic Zone 3.     
Metro Wastewater Reclamation Dist.Blue Plains Digesters,

Washington, DC

VSL Corporation

2011 (B) 4 @3.0 MG Circumferentially and vertically post-tensioned. This design by us was for the walls only. The conventionally reinforced pile supported mat foundations and steel dome roofs were designed by others.The AWWA D115 tendon prestressed tank walls won in alternate bidding competition with a Crom style AWWA D110 alternate.    
Utah State University (USU)
Thermal Energy Storage Tank
VSL Corporation
2011 (B)
Design-
Build
2.0 Circumferentially and vertically prestressed concrete wall. Post-tensioned membrane floor and prestressed two-way flat-plate roof. Buried with two ft of earth over the roof. Roof is also designed for H-20 traffic loads as the tank is to be buried in the center of a football field. The AWWA D115 design won in alternate bidding competition with an AWWA D110 Type 1 tank (strand wrapped). Design for high seismic area. $780,000 39
City of Vernal, UT
VSL Corporation
2011 (B)
Design-
Build
3.0 Circumferentially and vertically prestressed concrete wall. Post-tensioned membrane floor and prestressed two-way flat-plate roof. Buried with two ft of earth over the roof. Design for high seismic area. $1,650,000 55
Green Mountain Water Co.
Pink Zone Tank Lakewood, CO
McLaughlin Water Engineers, Ltd.
2011 (B) 1.0 Horizontal and vertical post-tensioned; buried, 2-ft cover on roof; post-tensioned floor and roof slabs. Price includes excavation and backfill. $856,000 85.6
Jefferson Center Metropolitan District
Arvada, CO
TST, Inc.
2008 (B) 0.85 A potable water tank with a horizontally and vertically post-tensioned wall, post-tensioned two-way flat-plate roof and membrane floor with integral wall and column footings. Buried, price includes excavation and backfill. $547,000 64.4
Mina Abdulla Refinery
Kuwait
Paramount Ltd. of India,
Civil Engineer
2008
Design-
Build
2@0.8
2@3.0
2@0.3
Four circular prestressed concrete secondary clarifiers and four circular “tank-within-a-tank” pre-aeration and aeration basins. All are circumferentially and vertically prestressed. The clarifiers are open topped, and the A-Basins have aluminum dome roofs. There are also two rectangular prestressed concrete sand filters. The circular tanks have non-prestressed floors designed by others and open tops. The sand filters have horizontally and vertically post-tensioned walls, post tensioned floors and open tops. Unit prices are unknown, as the tanks were bid as part of a large WWTP.    
Consolidated Mutual Water Co.
Green Mountain, Lakewood, CO
2006 (B) 5.0
and
1.75
A “tank within a tank” to enable the client to operate different sized tanks in the summers and winters. Pestressed concrete walls, post-tensioned two-way flat-plate roof and membrane floor with integral wall and column footings. Buried, price includes rock excavation and backfill. $3,149,000 63
Town of Castle Rock
Castle Oaks Potable Water Tank,
Castle Rock, CO
HDR Engineers
2003 (B) 3.5 A circular prestressed concrete potable water tank with a horizontally and vertically post-tensioned wall, post-tensioned two-way flat-plate roof and membrane floor with integral wall and column footings. Above grade. 1,320,000 37.7
Black Hawk – Central City Sanitation Dist.
WW Treatment Fac.,
Black Hawk, CO
Greeley and Hansen LLC
2003 (B) 2 @
0.25
Two circular concrete prestressed concrete secondary clarifiers. Horizontally and vertically post-tensioned walls, post-tensioned floors. Open tops. Unit prices are unknown, as the tanks were bid as part of a $12,000,000 WWTP.    
San Lorenzo-Cagus Water Supply Auth.
San Lorenzo Tank, Puerto Rico
Gregory L. Morris and Assoc. Engineers
2003 3 Horizontal and vertical post-tensioned wall; above ground, includes site preparation on; post-tensioned roof and membrane floor.    
San Lorenzo-Cagus Water Supply Auth.
San Lorenzo Tank, Puerto Rico
Gregory L. Morris and Assoc. Engineers
2003 2 Horizontal and vertical post-tensioned wall; above ground, includes site preparation on; post-tensioned roof and membrane floor.    
Yingkou Waste Disposal Auth.
Yingkou WWTP,
People’s Republic of China,
Northeast Public Works Design and Research Institute
2002 (B) 1.6,
and
1.5
A circular primary clarifier, a circular secondary clarifier. Horizontally and vertically post-tensioned walls, post-tensioned membrane floors with integral wall footings / foundations. $220,000
and
$210,000
13.8
and
14.0
Panjin Waste Disposal Auth.
Panjin WWTP,
People’s Republic of China,
Northeast Public Works Design and Research Institute
2002 (B) 1.5 A circular prestressed concrete secondary clarifier. Horizontally and vertically post-tensioned walls, post-tensioned structural floors with tension piers and integral wall footings / foundations. $210,000 14
Jiamusi Municipal Auth.
City of Jiamusi,
People’s Republic of China
Northeast Public Works Design and Research Institute
2002 (B) 2@3.0 Circular prestressed concrete potable water tanks. Horizontally and vertically post-tensioned wall, post-tensioned membrane floor with integral wall and column footings. As with all tanks built in China to date, these have all unbonded tendons, in the floors, walls and roofs. Buried with 2 ft. of backfill on roofs. $481,900 8
Jinzhou Waste Disposal Auth.
Jinzhou WWTP,
People’s Republic of ChinaNortheast Public Works Designand Research Institute
2002 (B) 1.6
and
1.5
A circular clarifier. A circular secondary clarifier. Horizontally and vertically post-tensioned walls, post-tensioned structural floors with tension piers and integral wall footings / foundations. $170,000
and
$160,000
10.6
and
10.7
Town of Fraser,
Maryvale Subdivision,
Grand County, CO
McLaughlin Water Engineers
2001 (B) 0.5 Horizontal and vertical post-tensioned wall; buried includes excavation and backfill; post-tensioned floor and roof. Roof designed for two feet of backfill and 75 psf snow load. $620,000 1.24
City of Lafayette, CO
Lafayette Wastewater Treatment Plant,
McLaughlin Water Engineers
2001 (B) 0.2
and
0.4
A circular prestressed concrete primary clarifier, and a prestressed concrete secondary clarifier. Horizontal and vertical post-tensioned walls; buried; post-tensioned floors, open tops. Unit prices are unknown, as the tanks were bid as part of a $5,000,000 addition to the WWTP.    
Superior Metropolitan District No. 1
Rock Cr. WWTP,
Superior, CO
McLaughlin Water Engineers
2000 (B) 0.5 Clarifier with horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor, open top.Unit prices are unknown, as the tanks were bid as part of a $3,600,000 addition to the WWTP.    
Superior Metropolitan District No. 1
Superior, CO
McLaughlin Water Engineers
2000 (B) 2 @
0.5
Digester Tanks with horizontal and vertical post-tensioned walls; buried, includes excavation and backfill; post-tensioned floor and roof. Roof designed for three feet of backfill. Unit prices are unknown, as the tanks were bid as part of a $3,600,000 addition to the WWTP.    
City of Lafayette, CO
Yellow Zone Water Tank,
at the Baseline Road WTP
McLaughlin Water Engineers
1999 (B) 4 Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor and roof. Price includes a premium for an extremely tight site, without room for storage of the excavated materials. $1,400,000 35
Castle Rock Development Company
Meadows Yellow Zone Tank 12a
Castle Rock, CO
Meurer & Assoc., (Civil Engineer)
1999 (B) 4 Horizontal and vertical post-tensioned wall; buried, includes $177,000 for excavation and backfill; post-tensioned floor and roof. Price does not include $62,000 for lime-treated fill below the tank. $980,000 24.5
Superior Metropolitan District No. 1
Rock Cr. WWTP,
Superior, CO
High Zone Water Storage Tank,
McLaughlin Water Engineers
1999 (B) 0.5 Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor and roof. Roof designed for three feet of backfill plus H-20 trucks on the roof. Price does not include $78,500 for 5 ft. of lime-treated imported structural fill below the tank and exporting excess earth. $457,180 91.4
Superior Metropolitan District No. 1
Rock Cr. WWTP,
Superior, CO
McLaughlin Water Engineers
1999 (B) 0.35
and
2@0.5
Clarifier Tank and two Digester Tanks. Horizontal and vertical post-tensioned walls; buried, post-tensioned floors open top. Horizontal and vertical post-tensioned digester walls; buried, with up to three feet of backfill over the post-tensioned two-way flat plate roofs; post-tensioned floor slabs.Unit prices are unknown, as the tanks were bid as part of a $1,337,000 addition to the WWTP.    
Corporacion Servicos,
Mirador Norte, S.A.
Ciudad Modelo Water Tanks,
Santo Domingo, Dominican Republic,
Matsos & Arzeno, S.A.
1998
Design-
Build
2 @
2.0
Horizontal and vertical post-tensioned cast-in-place wall; not buried; post-tensioned membrane slab floor; post-tensioned two-way flat plate roof. Price includes structural design fee. $459,385
each
24.3
Grain Processing Corporation
Washington, IN
Bowen Engineering Corporation, G.C.
1998 (B)
Design-
Build
2@1.7
2@1.0
1@0.2
Value engineering redesign of conventionally reinforced concrete waste treatment tanks originally designed by others. The two 1.0 MG tanks were originally designed to be circular. The others were originally designed as rectangular. All were converted to circular prestressed concrete tanks with horizontally and vertically post-tensioned walls and two-way post-tensioned membrane floors. Price includes walkways on tops of the walls and launders as applicable, and excavation and backfill, but not piping and appurtenances or redesign fees. The owner saved $315,000 as a result of our design. $1,150,00 20.9
Superior Metropolitan District
Superior, CO
Low Zone Water Storage Tank,
McLaughlin Water Engineers
1998 (B) 1.6 Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor and roof. Roof designed for allowing water to rise into the cone, 3-feet above the wall joint. Price dose not include $37,500 for 5 ft. of lime-treated structural fill below the tank. $664,475 41.5
CBP Resources, Inc.
Fayetteville, NC
D.W. Burt Concrete Construction, Inc.
1997 (B)
Design-
Build
0.4 Horizontal post-tensioned only; conventionally reinforced vertically. Above grade, does not include site preparation. Open top gravity thickener. $108,00 27
CBP Resources, Inc.
Fayetteville, NC
D.W. Burt Concrete Construction, Inc.
1997 (B)
Design-
Build
2.2 Horizontal and vertical post-tensioned wall. Above grade, does not include site preparation. Open top clarifier. $245,000 11.1
City of Broomfield, CO
Interlocken Golf Course,
HDR Engineers
1997 (B) 6 Horizontally and vertically post-tensioned wall; buried, with up to 4 feet of backfill over the post-tensioned two-way flay plate roof; post-tensioned floor slab. Price includes excavation and backfill, stubbed-out piping and appurtenances. Price does not include about $90,000 for 10 ft. of lime-treated structural fill below the tank. This tank was designed for H-20 truck loads as it is buried under a public golf course. $1,320,00 22
Town of Castle Rock, CO
Purple Zone Tank,
McLaughlin Water Engineers
1997 (B) 1 Horizontal and vertical post-tensioned wall; partially buried, includes excavation and backfill; post-tensioned roof and membrane floor. $512,951 51.3
Cities of Englewood and Littleton, CO
Bi-City WWTP,
Englewood, CO
Brown & Caldwell
1996 (B) 1@2.0
1@1.5
Horizontal and vertical post-tensioned walls, above grade tanks. Price includes broken-fin exterior architectural concrete finish, (except white finish at external launder and brick veneer at wall base). Conventionally reinforced floor slab and integral wall footing designed by Brown & Caldwell, except for the effects of the fixed base wall connection. Open top. Prices do not include $95,600 for excavation and backfill for the 2.0 MG and $132,121 for the 1.5 MG tanks. $561,600
and
$417,628
28.1
and
27.2
Indianapolis Water Co.
South Well Field Backwash Tank
HNTB, Structural Engr.
1996
(Review)
0.3 Review and modifications to the design and details of the circular post-tensioned concrete backwash water tank. Horizontally and vertically post-tensioned floor and two-way flat plate roof.The owner hired us to assist HNTB in copying our typical design developed for circular prestressed concrete water tanks.    
City of Broomfield, CO
GWRRP WTP, Backwash Tank
Centric/Jones, Constructors
1996
(Repair)
1 Investigation and rehabilitation of distressed post-tensioned concrete tank originally designed by others. The radially post-tensioned floor slab had failed below the center column during the initial stressing operation.    
City of Westminster, CO
Semper WTP, Clearwell
Centric/Jones, Constructors
1996
(Repair)
5 Investigation and rehabilitation of distressed and leaking post-tensioned concrete tank originally designed by others. Floor slab had failed around a 5′-0″ diameter pipe.    
Town of Castle Rock, CO
Green Zone II Tank
Meurer and Assoc.
1995
(Review)
2 Review and modifications to the design and details of the post-tensioned concrete water tank. Horizontally and vertically post-tensioned wall with post-tensioned floor and two-way flat plate roof.    
Town of Silverthorne, CO
Golden Eagle Road,
McLaughlin Water Engineers
1995 (B) 0.5 Horizontally and vertically post-tensioned wall; with 3 feet of backfill over the post-tensioned two-way flat plate roof; post-tensioned floor slab. Price includes excavation and backfill, stubbed out piping and appurtenances. $287,022 57.4
City of Albuquerque, NM
Ponderosa Reservoir #2
URS Consultants
1993 (B) 6 Horizontally and vertically post-tensioned walls; buried, with 3 feet of backfill over the post-tensioned two-way flat-plate roof; post-tensioned floor slab. Price includes excavation and backfill, stubbed-out piping and appurtenances. $1,465,900 24.4
Montaire Farms of DelMarVa
Selbyville, Delaware
1993
(Review)
0.5 Peer review and modifications to the design of a circular prestressed concrete wastewater treatment tank designed by others prior to construction.    
Texas Instruments Corp.
McKinney, TX
Texas Instruments Corp.
VSL Corporation
1992
(Repair)
3 Investigation and rehabilitation of seepage through the wall of a circular prestressed concrete tank with cast-in-place core wall, originally designed by others.    
Manenggon Hills Golf Resort,
Guam, U.S.A.
Dames & Moore, Denver, CO
1991 (B) 1.5 Horizontal and vertical post-tensioned wall; partially buried; conventionally reinforced floor and roof slabs. Contains the days effluent from the wastewater treatment plant for spreading over the golf course at night.    
City of Boulder and Pine Brook Water District,
Boulder, CO
McLaughlin Water Engineers
1991 (B) 4.1
and
0.6
Horizontal and vertical post-tensioned walls; buried with backfill sloping up from 2 feet to 10 feet deep over the roof; post-tensioned floor and roof slabs. Price includes excavation and backfill, price does not include $74,460 for over excavation and lime stabilization of up to 25 feet of soft clay under 1/2 of the tank base. The owner elected to build a tank-within-a-tank in order to not commingle water supplies while sharing the same limited site. $974,664
and
$97,042
(Wall only)
23.8
and
16.2
(Wall)
Wampler Longacre Poultry
Harrisonburg, VA
VSL Corporation
1991
(Reviewed)
0.7 Review and modification to the design of a clarifier tank designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and post-tensioned top. $135,000 19.3
West Lynn Creamery
Lynn, MA
VSL Corporation
1991
(Review)
1.8
and
0.2
Review and modifications to the design of two anaerobic digester tanks designed by others, prior to construction. Horizontal and vertical post-tensioned walls, post-tensioned floor and open top. A major AWWA D110 wire-wound tank builder bid $225,000 higher for the same work. $515,000 28.6
City of Salida, CO
McLaughlin Water Engineers
1990
(Repair)
1 Horizontal post-tensioned repair of a distressed wire-wrapped tank originally designed by others.    
Cities of Englewood and Littleton, CO
Bi-City WWTP,
Englewood, CO
Dywidag Systems International,USA
Brown &Caldwell
(Civil Engineer)
1990 (B)
Design-Build
2 @
2.0
Horizontal and vertical post-tensioned walls, above grade with a broken fin exterior architectural finish except for a white finish at external launder and brick veneer at the base of the walls. Conventionally reinforced floor slab and wall footing was designed by others, except for effects of fixed base wall connection. Won in “contractor design” competition with other tendon suppliers and tank designers.Unit prices are unknown, as the tanks were bid as part of a $25,000,000 addition to the WWTP.    
City of Albuquerque, NM
Simms Reservoir
Bohannan-Huston, Inc.
1990 (B) 7 Horizontal and vertical and post-tensioned wall; buried; post-tensioned floor and roof. Price includes “normal” excavation and backfill; price does not include about 3.04/gal. worth of rock excavation, over-excavation of collapsible soils and replacement with select backfill below the tank. The owner declined our recommendation for a strand-wrapped wall alternate due to prior poor performance of a strand-wound tank designed by others and good experience with a prior tendon tank we designed. A distressed, above ground, wire-wound tank formerly serving this zone was demolished when this tank was finished. $1,290,000 18.4
Perdue Farms, Inc.
Accomac, VA
VSL Corporation
1990
(Review)
2.5 Review and modifications to the design of a clarifier tank designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor, open top. $285,000 11.4
Perdue Farms, Inc.
Accomac, VA
VSL Corporation
1990
(Review)
2 @
4.0
Review and modifications to the design of waste sludge tanks designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and open top. $400,000 10
Lookout Mountain Water District,
Chief Hosa Area,
Jefferson County, CO
1989 (B) 1 Horizontal and vertical post-tensioned wall; post-tensioned floor and roof slabs; buried with no soil cover on the roof slab; price includes rock excavation, backfill and some piping. Owner paid $100,000 additional in first costs for the buried post-tensioned concrete tank in alternate bidding competition with a used steel tank when he considered the present worth of repainting costs, aesthetic value and other advantages of buried concrete reservoir. $347,000 34.7
Snowmass Water and San. District
Ridgerun Tank,
Snowmass at Aspen, CO
McLaughlin Water Engineers
1989 (B) 1 Horizontal and vertical post-tensioned wall; post-tensioned roof slab; post-tensioned mat foundation as the floor slab; buried with soil cover varying from 4′ to 17′-6″ to blend in with the existing topography of the site. This required stepped floor and roof slabs, includes excavation and backfill. $645,000 64.5
Ciba-Geigy Chemical Company
McIntosh, AL
VSL Corporation
1988
(Review)
2.5 Review and modification to the design of a storm water detention tank, designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and open top. Cost shown is for the post-tensioned concrete and floor and wall only. $202,000 8.1
Superior Metropolitan District
Superior, CO
McLaughlin Water Engineers
1988 (B) 1.4 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned floor and roof. Floor and roof had additional post-tensioned reinforcement to withstand potential foundation movements. $343,321 24.5
Consolidated Mutual Water Co.
Green Mountain, Golden, CO
McLaughlin Water Engineers
1988 (B) 0.8 Horizontal and vertical post-tensioned; buried; post-tensioned floor and roof slabs. $225,000 28.1
Snowmass Water and San. District
Snowmass at Aspen, CO
McLaughlin Water Engineers
1988 (B) 1 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned floor and roof, soil cover varied from 2 ft. to 15 ft. to blend in with the existing topography, requiring steeped footings and roof slabs. $446,752 44.7
Triview Metropolitan District
Monument, CO
KKBNA, Inc.
1988
(Review)
1.5 Review and modifications to the design of a water tank, designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and roof.    
Trinity River Authority
Grand Prairie, TX
VSL Corporation
1988
(Review)
2 @
1.4
Review and modifications to the design of digester tanks, designed by others, prior to construction. Post-tensioned wall with “V” shaped tendons. Conventionally reinforced floor. These tanks were built inside distressed and abandoned wire-wrapped tanks, using the old walls as exterior forms. Fiberglass dome roof (not included in the cost.) 2 @
$185,000
13.2
Hillsdale Powell Utility District
Knoxville, TN
VSL Corporation
1988
(Review)
1.2 Review and modification to the design of a clarifier tank, designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor, open top. $226,000 18.8
Ciba-Geigy Chemical Company McIntosh, AL
VSL Corporation
1988
(Review)
2 Review and modification to the design of a storm water detention tank, designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and open top. Cost shown is for the post-tensioned concrete and floor and wall only. $146,000 7.3
Ciba-Geigy Chemical Company
McIntosh, AL
VSL Corporation
1988
(Repair)
3.5 Investigation and rehabilitation of distressed emergency holding tank for hazardous wastes, designed by others. Horizontal and vertical post-tensioned wall, post-tensioned floor, open top. This tank is fiberglass lined to withstand anything with a pH between 2 & 12. Cost shown is for the post-tensioned concrete floor and wall only. $236,000 6.7
Ciba-Geigy Chemical Company
McIntosh, AL
VSL Corporation
1988
(Repair)
3 @
0.85
Investigation and rehabilitation of distressed floors (due to subgrade settlement) of clarifier tanks for treatment of hazardous wastes, designed by others. Horizontally and vertical post-tensioned wall, conventionally reinforced floor and open top. 3 @
$102,000
12
Ciba-Geigy Chemical Company
McIntosh, AL
VSL Corporation
1988
(Repair)
2 @
0.5
Investigation and rehabilitation of distressed floors (due to subgrade settlement) of thickener tanks for treatment of hazardous waste, designed by others. Horizontal and vertical post-tensioned wall, conventionally reinforced floor and open top. Cost shown is for post-tensioned concrete floors and walls only. 2 @
$81,000
16.2
National Park Service
Grand Canyon National Park, AZ
Mclaughlin Water Engineers
1987 (N) 1 Horizontal and vertical post-tensioned; partially buried, rock excavation; Chemically treated exterior color to blend in with the scenery.    
Consolidated Mutual Water Co.
N. Table Mountain, Golden, CO
McLaughlin Water Engineers
1987 (B) 2 Horizontal and vertical post-tensioned; buried, includes rock excavation and backfill; post-tensioned roof and floor. $387,200 19.4
City of Golden, CO
N. Table Mountain, Golden, CO
McLaughlin Water Engineers
1987 (B) 2 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. $376,115 18.8
Town of Castle Rock, CO
McLaughlin Water Engineers
1986 (B) 2 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. $444,000 22.2
Meadows Metropolitan District No. 1,
Castle Rock, CO
Taranto, Stanton and Tagge
(TST, Inc.)
1986 (B) 3 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. $509,500 17
Green Mountain Water & Sanitation District,
Lakewood, CO
McLaughlin Water Engineers, Ltd.
1985 (B) 1 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; a post-tensioned, drilled pier supported, structural concrete floor was required due to swelling soil conditions at the site; post-tensioned roof. $400,000 40
Castle Pines North Metropolitan District,
Castle Rock, CO
Taranto, Stanton and Tagge
(TST, Inc.)
1984 (N) 2 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. $584,000 29.2
Town of Castle Rock, COCornerstone Builders, Inc. 1984 (B)
Design-Build
0.5 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. The post-tensioned tank was preferred by the owner over a conventionally reinforced tank alternate, which was bid $5,000 less by the same contractor. $183,277 36.7
Stonegate Center Metropolitan District,
Parker, CO
Greiner Engineering
1984 (B) 2.5 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. $474,300 19
Denver Water Board
Littleton, CO
Meheen Engineering Corp.
1983 (B)
Review
10 Computer analysis and wall design review and modifications of “V” shaped tendon design by others. Post-tensioned roof and floor. Includes $423,000 excavation and backfill (buried) excludes $359,000 piping, valves and miscellaneous. $1,779,000 17.8
Parkville Water District
Leadville, CO
W.W. Wheeler & Associates
1983 (B) 1 Horizontal and vertical post-tensioned; buried, includes $33,000 excavation (done in 1982) and backfill; post-tensioned roof. $275,289 27.5
Snowmasss Water and San. Dist.
Snowmass at Aspen, CO
Mclaughlin Water Engineers, Ltd.
1983 (B) 1 Horizontal and vertical post-tensioned; buried with up to 8.5 feet of backfill on post-tensioned tank roof sloped to accommodate the ski run this tank is located in; includes excavation and backfill ($104,000 included for the special sheet pile shoring, dirtwork and under-drain, required due to poor earth-work conditions and site constraints); post-tensioned floor. $430,274 43
Town of Silverthorne, CO
Mclaughlin Water Engineers, Ltd.
1983 (B) 1 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. $344,777 34.5
Southgate Water Dist.
Littleton, CO
Meurer and Associates
1982(C)
(Wall
Analysis)
6 Computer structural analysis of the post-tensioned wall for design by others.    
City of Fraser, CO
Rocky Mountain Engineers
1982 (B) 1 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. $295,000 29.5
National Park Service
U.S. Dept. of Interior Yellowstone National Park Wright-McLaughlin Engineers
1982 (B) 0.75 Horizontal and vertical post-tensioned; buried, includes $25,000 worth of rock excavation and backfill; post-tensioned roof. $470,000 62.7
Castle Pines Metropolitan Dist.Castle Rock, CO Taranto, Stanton & Tagge 1981 (N) 2 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. $500,000 25
E. Cherry Cr. Valley Water and San. Dist.
Aurora, CO
Meurer and Associates
1981 (C)
(Wall
Analysis)
5 Computer structural analysis of the post-tensioned wall for design by others.    
Battlement Mesa Inc.
Parachute, CO
Wright-McLaughlin Engineers
1981 (B) 3 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. $623,850 20.8
City of Albuquerque, NM
Walker Reservoir,
Gordon Herkenhoff & Associates
1981 (B) 6.5 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. Won in alternate bidding competition with a steel tank. $1,105,000 17
Willows Water District
Englewood, CO
Meurer and Associates
1980 (C)
(Wall
Analysis)
5.25 Computer structural analysis of the post-tensioned wall for design by others.    
Roxborough Water and San.
Littleton, CO
Wright-McLaughlin Engineers
1980 (B) 1 Horizontal and vertical post-tensioned; buried, includes rock excavation and backfill; post-tensioned roof. $296,000 29.6
Ft. Collins / Loveland Water Dist.
Ft. Collins, CO
M&I Inc. Consulting Engineers
1980 (B) 4 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. $640,220 16
Battlement Mesa Inc.
Parachute, CO
Wright-McLaughlin Engineers
1980 (B) 1 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. $294,535 29.5
National Park Service
Yellowstone National Park, WY
Wright-McLaughlin Engineers
1980 (B) 1.6 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. $400,965 25.1
National Park Service
Yellowstone National Park, WY
Wright-McLaughlin Engineers
1979 (B) 1 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. $408,524 40.8
Ft. Collins/Loveland, Water District
Windsor, CO;
Donath Lake Phase I
M&I, Inc. Consulting Engineers
1979 (B) 2 Horizontal and vertical post-tensioned; buried, includes rock excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. $347,000 17.4
Mt. Werner Water and San. Dist.
Steamboat Springs, CO
Wright-McLaughlin Engineers
1979 (B) 1 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. $307,000 30.7
City of Brigham City
Brigham City, UT
VSL Corporation
1978 (C)
Design-Build
5 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.Seismic Zone 3. $860,000 17.2
Keystone Resort
Summit County, CO
Meurer and Associates
1978 (C)
(Wall
Analysis)
1.5 Computer structural analysis of the post-tensioned wall for design by others.    
Town of Telluride, CO
Wright-McLaughlin Engineers
1978 (B) 0.75 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. $174,000 23.2
Denver Water Board Denver, CO
DMJM-Phillips Reister
1978 (B) 10 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Owner selected three circular post-tensioned 10 M.G. tanks for this site in lieu of two rectangular conventionally reinforced 15 M.G. tanks proposed by others. $1,225,856 12.3
E. Cherry Cr. Valley Water & San. Dist.
Aurora, CO
Meurer and Associates
1977 (C)
(Wall
Analysis)
1 Computer structural analysis of the post-tensioned wall for design by others.    
City of Loveland, CO
M&I, Inc. Consulting Engrs
1977 (C)
(Repair)
3 Horizontal post-tensioned tendon repair of a distressed wire-wrapped tank originally designed by others.    
East Larimer Co. Water District
Fort Collins, CO
M&I, Inc. Consulting Engineers
1977 (B) 1 Horizontal and vertical post-tensioned with tendons; buried, includes excavation and backfill; post-tensioned roof.Won alternate bidding competition with wire- and strand-wrapped wall designs. $146,000 14.6
Eastman Kodak Company
Windsor, CO
1977 (B) 3 Horizontal and vertical post-tensioned with tendons; not buried; includes $80,000 architectural precast concrete; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. $333,000 11.1
East Larimer Co. Water Dist.
Fort Collins, CO
M&I, Inc. Consulting Engrs
1977 (B) 2.5 Horizontal and vertical post-tensioned with tendons; buried, includes excavation and backfill; post-tensioned roof.Won in alternate bidding competition with wire and strand-wrapped wall designs. $279,000 11.2
City of Canon City, CO
M&I, Inc.
Consulting Engrs
1977 (B) 4 Horizontal and vertical post-tensioned; part buried, includes excavation and backfill; post-tensioned roof. $439,000 11
Salt Lake County Water District
Salt Lake City, UT
Atlas Prestressing
1976 (C)
Design-Build
3 Horizontal and vertical post-tensioned; part buried includes excavation and backfill; post-tensioned roof and floor. $345,000 11.5
City of West Jordan, UT
Atlas Prestressing
1976 (C)
Design-Build
2 Horizontal and vertical post-tensioned; part buried, includes excavation and backfill; post-tensioned roof and floor. $230,000 11.5
City of Spokane, WA
Atlas Prestressing
1976 (C)
Design-Build
3@
2.4
Horizontal and vertical post-tensioned with tendons; part buried; dome roof; anaerobic digesters. See
summary
below
See
summary
below
City of Spokane, WA
Atlas Prestressing
1976 (C)
Design-Build
3@
0.3
Horizontal and vertical post-tensioned with tendons; part buried; open top; gravity thickeners. See
summary
below
See
summary
below
City of Spokane, WA
Atlas Prestressing
1976 (C)
Design-Build
6@
2.6
Horizontal and vertical post-tensioned with tendons; part buried; open top; secondary clarifiers. See
summary
below
See
summary
below
Spokane Tank Project Summary 1976
Spokane
Tank
Remarks
  The AWWA D115 style tendon design for the 12 Spokane tanks noted above, saved $1,800,000 for the owner compared to strand-wrapped alternates designed by others. The solitary $4,000,000 bid received on the AWWA D110 style strand wrapped tanks had been declared invalid by the EPA (who was partially funding the project) because of lack of fair competition. The contractor then invited nationwide proposals from tank designers and prestressing firms. The tendon tank design by our firm won. (Contact J&CA for a brief article reprinted from Engineering News Record about this savings.) $2,200,000
Total for
walls only
9.3
Avg.
Centennial Water District
Highlands Ranch, CO Meurer and Associates
1976 (C)
(Wall
Analysis)
4 Computer structural analysis of the post-tensioned wall for design by others.    
Southgate Water District
Littleton, CO
Meurer and Associates
1976 (C)
(Wall Analysis)
2 Computer structural analysis of the post-tensioned wall for design by others.    
City of Louisville, CO
Louisville WTP
Atlas Prestressing
Rocky Mountain Consultants, Inc., Civil Engineers
1976 (B)
Design-Build
3 Horizontal and vertical post-tensioned; with a post-tensioned roof; won in a design / build competition with a steel tank and a reinforced concrete tank with a precast roof. We designed the post-tensioned structural floor as a consultant to Atlas. The pier-supported floor was required due to site conditions. The tank is above ground. $313,000 10.4
City of Carbondale, CO
Wright-McLaughlin Engineers
1976 (B) 2 Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. $255,000 12.8
Ken Caryl Ranch Water District
Littleton, CO
Wright-McLaughlin Engineers
1975 (C) 5 Horizontal and vertical post-tensioned with tendons; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. $580,000 11.6
Ken Caryl Ranch Water District
Littleton, CO
Wright-McLaughlin Engineers
1975 (C) 2 @
2.0
Horizontal and vertical post-tensioned with tendons; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. Higher price includes some rock excavation. $283,000
&
$293,000
14.1
&
14.6
City of Arvada, CO
80th & Simms,
Arvada, CO
Wright-McLaughlin Engineers
1974 (C) 10 Horizontal and vertical post-tensioned with tendons; was $5,000 higher than strand wrapped alternate, but was selected by contractor and owner due to advantages in wintertime constructability; buried, includes excavation and backfill, post-tensioned roof with tennis courts; includes all landscaping. $860,000 8.6
City of Englewood,
CO
1972 (C) 6.0 Horizontal and vertical post-tensioned with tendons; won in alternate bidding competition with strand wrapped and wire wrapped shotcrete with steel diaphragm; part buried, includes excavation and backfill; post-tensioned roof. $536,000 8.9